:::
Volume Reduction Center status
Last Update: May 22, 2020
Volume Reduction Center status
 (Mar 2019)
 
The Volume Reduction Center is located at the Kuosheng NPP. It is equipped with a 100 kg per hour incinerator, at a volume reduction factor of 96.7% to 99%, and a 5 waste drums per hour supercompactor at a volume reduction factor of 66.6% to 80%. 
 
Operation Quantity
Incineration 21,632.7 kg
Ash 15 drums
Compression 0 drums
After compression 0 drums